Skip to content

Our Projects

Bopela Group develops innovative solutions to build critical infrastructure and landmark projects.

We have successfully executed and accomplished a number of projects and some of the recent ones are:

PROJECT YEAR SCOPE OF WORK CLIENT VALUE
Nteletsa Project 1 & 2 (Subcontracted by Brolaz Botswana ) 2001-2009 Preventative and Corrective Maintenance on Window Type and Split Type Air Conditioning units in Base Stations in the Northern and Southern Region of Botswana MASCOM, ORANGE, Botswana Telecommunication Corporation (BTC), BEE Mobile (2007) P8,000,000.00 (USD$ 697,000.00)
Nteletsa Project 1 & 2 (Subcontracted by Brolaz Botswana and Sectional Poles) 2004-2009 Transportation of building materials to base stations country wide, Tower Foundations, Tower Rigging, RF, Transmission and Network Optimizations MASCOM, ORANGE, Botswana Telecommunication Corporation, BEE Mobile P3,000,000.00(USD$ 261,000.00)
Universal House (Immigration Offices) 2001 Installation and Maintenance of all HVAC: Mid-wall Splits, Cassettes Units, Hide Away Units, Air Conditioning, Fresh Air Supply and Extraction Systems, Mr Jamali P600,000.00 (USD$53 000.00) (Labour Only)
Westgate Mall 2005 Installed and Commissioned: Cold Rooms , Freezer Rooms, HVAC, Refrigeration, Daikin VRV Systems, Daikin Cassettes Units, Daikin Hide Away Units and Daikin Middle Splits Mr Jamali P700,000.00 (USD $ 61 000.00) (Labour only)
Kgaleview and Molepolole Substations (Subcontracted by ACTOM) 2007-2008 Construction of Control Buildings, Plinths Foundations, Oils Dams, Oil Drainage Systems and Access Roads Botswana Power Corporation (BPC) P900,000.00 (USD$ 79,000.00) (Per Substation)
Ministry of Health Botswana HQ (Subcontracted by Improve-Air Environmental Solutions IES) JV Stocks and Stocks 2003-2005 Installed, Commissioned and Maintained: 4 Trane Chillers, 1010 Fan Coil Units, 26 Air Handling Units, BMS Supervised by LANDIS AND STAEFA, 12 Stair Case Pressurization fans, Fountain Pools, Hot Water Systems, Carbon Monoxide Extraction Fans, Basement Air Supply VSD Controlled, Under-Bar counter fridges and kitchen Equipment Ministry of Health Botswana P1,800,000.00 (USD$ 157,000.00) (Labour Only)
Game City Mall Phase 1 (Subcontracted by Improve-Air Environmental Solutions IES) JV Stocks and Stocks Managed by Khumo Properties 2002-2017 Installed, Commissioned and Maintained: 112 Daikin Hide Away Units, 33 Daikin Air Cooled Packaged Units, 12 Air Dale Air Cooled Packaged Units, 17 Cassettes and 24 Mid-Wall Splits Turn-Star Holdings Botswana P3,000,000.00 (USD$ 261,000.00) (Labour Only)
Game City Mall Phase 2 & 3 Expansion, Managed by Khumo Properties 2002-2017 Installed, Commissioned and Maintained: 36 Hide Away Units, 16 Cassettes Units and 8 Durnham Bush Air Cooled Packaged Units Maintenance of all the equipment in the Mall from 2003-2017 Turn-Star Holdings Botswana P800,000.00 (USD$ 70,000) (Labour Only), P12,000,000.00 (USD$ 1,041,000.00)
GH Group (Subcontracted by Kentz) 2003 Installed, Commissioned and Maintained: 38 Durnham Bush Air Cooled Packaged Units, Cold Rooms and Freezer Rooms Goolam Abdula Botswana P800,000.00 (USD$ 70,000) (Labour Only)
River Walk Mall (Subcontracted by Kentz) 2001-2002 Installed and Commissioned: Mid-Wall Splits, Cassettes Ceilings and Hide Away Units River Walk Shopping Mall Botswana P800,000.00 (USD$ 70,000.00) (Labour Only)
Telecel Zimbabwe (Subcontracted by Bromain Logistics) February – March 2010 Transportation of materials to respective sites, Raft Foundations, Steel Fixing, Concrete Casting, Curing, Rigging and Palisade Fencing (Ten (10) Base stations) Telecel Zimbabwe USD$ 50,000.00 (Labour only)
NetOne Expansion (Subcontracted by Murry and Roberts) 2010-2013 Site Excavations, Hauling of Building materials (Riversand, Concrete stones, Bricks, Reinforcement Steel, Tower Sections, Cement and Water) to the top of mountains across Zimbabwe, Raft Foundations, Steel Fixing, Concrete Casting, Curing, Back Filling, Rigging, Palisade fencing , RF and Network Optimizations. NetOne Zimbabwe USD$ 3,000,000.00
NetOne (Subcontracted by Huawei and Sectional Poles) 2012-2016 Transportation of Disguised Pine Tree Masts from Sectional Poles Factory (South Africa) to Zimbabwe, Delivery of river sand, concrete stones, bricks, reinforcement steel, cement and water to various sites for the construction of foundations for Disguised Pine Tree Masts and Monopole Masts across Zimbabwe. Tower Foundation, Rigging, RF, Network Optimizations and Palisade Fencing NetOne Zimbabwe USD$ 5,000,000.00
NMBB Project (Subcontracted by Huawei) 2014-2015 Construction of 100 Disguised Pine Tree Masts Foundations in a record breaking of eight months using our own 50 Ton Crane for Rigging. Palisade Fencing NetOne Zimbabwe USD$ 3,700,000.00
Medupi Power Station (Subcontracted by Improve-Air Environmental Solutions IES) 2017-2020 Commissioned, Tested and De-snagged HVAC Equipment: 52 Trane Chillers, 74 CIAT Chillers, 36 Carrier Chillers and 317 Air Handling Units Eskom South Africa R7,500,000.00 (USD$ 498,000.00)

get started

A uniquely positioned telecoms infrastructure platform

get started